Sign In | Join Free | My enlightcorp.com
China Qingdao Jingcheng Weiye Environmental Protection Technology Co., Ltd logo
Qingdao Jingcheng Weiye Environmental Protection Technology Co., Ltd
Solution expert for organic waste treatment bio-resource utilization eco-energy environmental protection project
Site Member

4 Years

Home > Integrated Sewage Treatment Equipment >

CSTR 50m3/D Commercial Wastewater Treatment Plant For Hospital

Qingdao Jingcheng Weiye Environmental Protection Technology Co., Ltd
Contact Now

CSTR 50m3/D Commercial Wastewater Treatment Plant For Hospital

Brand Name : JCWY

Model Number : JCH

Certification : ISO9001:2015

Place of Origin : China

MOQ : 1set

Price : USD1000~50000/set

Payment Terms : L/C, T/T

Supply Ability : 50sets/month

Delivery Time : 20~40working days

Packaging Details : Normal package

Material : Carbon steel/FRP

Application : Remove Harmful Material

Type : Integrated

Condition : New

Color : Customers Demands

Function : Water Purification Plant

Contact Now

Commercial Hospital Sewage Waste Water Treatment Plant Equipment

Integrated Carbon Sewage Treatment Equipment Description:

Carbon steel integrated sewage treatment equipment is a water production process that combines biological treatment technology and membrane separation technology, which can effectively carry out solid-liquid separation and obtain directly used stable reclaimed water. Effectively remove ammonia nitrogen, suspended matter in effluent, turbidity close to zero, has the advantages of low energy consumption and small footprint.

Integrated Carbon Sewage Treatment Equipment Showing:

CSTR 50m3/D Commercial Wastewater Treatment Plant For Hospital

CSTR 50m3/D Commercial Wastewater Treatment Plant For Hospital

CSTR 50m3/D Commercial Wastewater Treatment Plant For Hospital

Integrated Carbon Sewage Treatment Equipment Advantages:

(1) It can be buried below the ground surface, the device does not occupy the surface area of the ground, it does not need to build a house, and it does not need heating and insulation;

(2) It consists of two sets of steel structure equipment, which is anti-corrosive paint. The antiseptic life can reach more than 15 years;

(3) The AO biological treatment process uses a push-flow biological contact oxidation tank, which can improve the solubility of oxygen in the air in water. The volume load of the filler is relatively low, and the microorganisms are in their own oxidation stage, so the amount of sludge produced is small, and it generally only takes about 90 days to drain the sludge.

(4) In order to reduce the impact of noise on the surrounding environment, the blower equipment adopts noise reduction measures such as vibration isolation pads and silencers;

(5) The fully automatic electrical control system and equipment damage alarm system have good reliability, so they are generally no special staff is required, only monthly or quarterly repairs and maintenance.

CSTR 50m3/D Commercial Wastewater Treatment Plant For Hospital

CSTR 50m3/D Commercial Wastewater Treatment Plant For Hospital

CSTR 50m3/D Commercial Wastewater Treatment Plant For Hospital

CSTR 50m3/D Commercial Wastewater Treatment Plant For Hospital


Product Tags:

50m3/D Commercial Wastewater Treatment Plant

      

50m3/D Wastewater Treatment Plant For Hospital

      

CSTR hospital sewage treatment plant

      
Quality CSTR 50m3/D Commercial Wastewater Treatment Plant For Hospital for sale

CSTR 50m3/D Commercial Wastewater Treatment Plant For Hospital Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingdao Jingcheng Weiye Environmental Protection Technology Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)